What drives the cost of a machined part
Change one option at a time and watch which decisions actually move the number. Every figure here is a relative multiplier, not a price.
This is not a quotation tool. Absolute prices depend on the specific geometry, current material rates and available capacity — what this shows is the relative weight of each decision, so you can see where the money goes before you finalise the drawing.
Relative cost index
1.00×
This is the baseline configuration: 250 pieces in 6061 aluminium, general tolerances, two faces, as-machined, no inspection report.
Where it comes from
- 250 pieces—
- Aluminium 6061—
- ISO 2768-m (general)—
- 2 faces—
- As-machined (Ra 1.6)—
- None — in-process only—
Worth considering
Nothing in this configuration stands out as an avoidable cost. Send the file and we will look at the geometry itself.
Multipliers are indicative of order of magnitude for typical prismatic parts. Your actual quotation is calculated from the real geometry.
How to use this
Find the biggest bar
The longest bar in the breakdown is where your money is going. If it is a requirement you cannot relax, at least you know what you are paying for.
Check it is really needed
Tolerance and finish callouts are often applied to a whole drawing when only two or three features need them. That is the single most common avoidable cost.
Send the file
Geometry drives the rest. Upload a STEP and a manufacturing engineer marks up anything difficult and returns it with the quotation.