Lanpu.Precision

Rapid Prototyping — design guidelines

On a prototype the goal is to learn something quickly, so the right design decisions are different from production. It is usually worth relaxing tolerances and accepting a substitute material to get the part two weeks earlier.

Constraints specific to this process

These are the limits that come from this process in particular. The general rules on wall thickness, corner radii and hole depth apply on top of them.

ParameterDesign to thisNo surcharge, no discussion neededWe can reachAchievable, but affects price or lead timeWhere the limit comes from
Tolerance on a fit-check partISO 2768-m±0.02 mm on 2 featuresTightening only the mating features keeps the part in the fast lane. A drawing where everything is tight moves the job into the precision queue and adds days.
Material substitution6061 for any aluminiumExact grade on requestWe hold 6061 and 304 in stock in most sizes. A specific grade like 7075-T7351 or 17-4PH may add a week of material lead time for a single prototype.
Cosmetic finishAs-machinedBead blast + anodiseAs-machined ships the same day it comes off the machine. Anodising goes to an outside plater and adds three to five days regardless of quantity.
Quantity for a design iteration3 pcs1 pcProgramming and setup dominate the price of a one-off, so the second and third pieces cost a fraction of the first. Three gives you one to test to destruction, one to measure and one to keep.

What we see go wrong most often

Recurring issues on the drawings that reach us. None of them are hard to avoid once you know to look for them.

  • Designing the prototype with production tolerances and then being surprised by the price. Tell us which dimensions you are actually testing and we relax the rest.

General machining rules

The numbers that apply across every cutting process — wall thickness, radii, holes, threads, tolerances and cost drivers.

Every quotation includes a manufacturability review against these rules. If something in your model falls outside them, we tell you before you commit, not after the first article fails.

Not sure whether your part clears these limits?

Send the STEP file. A manufacturing engineer marks up anything that will be difficult and returns it with the quotation — no charge, no obligation.