Lanpu.Precision

Gestione della qualità

Un sistema documentato, strumenti tarati e registrazioni di collaudo verificabili.

ISO 9001:2015ISO 13485IATF 16949RoHS / REACH

Processo di collaudo

  1. 01

    Incoming material

    Lot logged, certificate verified, PMI where specified.

  2. 02

    First article

    Every ballooned characteristic measured and recorded.

  3. 03

    In-process

    SPC on nominated dimensions, on-machine probing.

  4. 04

    Final inspection

    CMM in a 20 ± 1 °C room, full report issued.

  5. 05

    Packing & release

    Protective packing, documentation pack, traceable label.

Strumenti di misura

Temperature-controlled metrology room, 20 ± 1 °C.

Strumenti di misura

EquipmentCapabilityQty
CMM a portale (sala climatizzata)1000 × 800 × 600 mm, MPE 1.8 + L/350 µm3
Sistemi di misura ottici400 × 300 mm, 0.001 mm resolution5
RugosimetriRa / Rz / Rt, 0.001 µm resolution4
Altimetri e piani in granito600 mm, Grade 0 granite12
Durometri (Rockwell / Vickers)HRC / HV / HB scales2
Calibri filettati e tamponiM1 – M64, UNC/UNF, BSP, NPT400
Proiettore di profiliØ 400 mm screen, 10× – 100×2
Misuratore di spessore rivestimento (XRF)0.1 – 50 µm, multi-layer1
Rilevatore di fughe all'elioto 1 × 10⁻⁹ mbar·l/s1
Banco di prova idrostaticato 700 bar with chart recording1

Documentazione fornita

Certificate of Conformity
Dimensional inspection report
Material certificate EN 10204 3.1
AS9102 first-article report
PPAP Level 1–3 package
RoHS / REACH declaration
Hydrostatic / leak test record
Special process certificates

Copie dei certificati disponibili su richiesta. Audit cliente e ispezioni di terze parti (SGS, BV, TÜV) sono benvenuti.

La documentazione tecnica è mantenuta in inglese per preservare la precisione dei termini ingegneristici.

A quality system built for audits, not for marketing

Quality in contract machining is not a slogan — it is a set of records that survives scrutiny two years after the parts shipped. Our system is built around that test: every job carries a traceable chain from the purchase order to the raw material certificate, the machine, the operator, the programme revision, the inspection data and the packing list.

Incoming material control

Raw material arrives with an EN 10204 3.1 certificate and is logged against a unique lot number before it touches a machine. Lots are physically segregated and identified with colour-coded tags; the lot number follows the job travel sheet all the way to the packing list.

For medical, aerospace and pressure-service work, positive material identification (PMI) is performed on receipt and recorded.

First-article inspection

Before a production run is released, a first article is measured against every ballooned characteristic on the drawing. The report records the actual measured value and the measuring instrument used — not a pass/fail tick.

Where you work to AS9102, we issue Forms 1, 2 and 3 in the standard format. Where you work to PPAP, we supply the level (1 to 3) your programme requires, including control plan, process flow diagram, MSA and capability study.

In-process control

Nominated dimensions are monitored through the run at a frequency set by the control plan — typically first piece, every twentieth piece, and last piece for a 500-off batch. Where a characteristic is safety-critical or capability is marginal, the frequency increases and the data is plotted on an SPC chart.

Machine probes verify datums and critical bores on the machine before the part is released from the fixture, so drift is corrected while the part can still be saved.

Metrology environment

Final inspection is performed in a temperature-controlled room held at 20 ± 1 °C. Parts are allowed to stabilise before measurement — a 300 mm aluminium part measured at 26 °C reads roughly 0.03 mm larger than the same part at 20 °C, which is the entire tolerance band on a precision fit.

All measuring equipment is calibrated on a documented schedule against standards traceable to national reference standards, and the calibration certificate for any instrument used on your parts is available on request.

Non-conformance and corrective action

Non-conformances are recorded, contained, dispositioned and closed with a documented root cause. Where the escape reached a customer, we issue an 8D report with containment, root cause, corrective action and verification of effectiveness.

We do not argue about a tolerance we missed. If the part is outside the drawing, it is our problem to fix.

What you receive with every shipment

  • Certificate of conformity referencing the drawing number and revision
  • Dimensional report covering the critical characteristics
  • Material certificate (EN 10204 3.1) on request or where the specification requires it
  • Special process certificates — heat treatment, plating, passivation, NDT
  • RoHS and REACH declarations where applicable

Una qualità verificabile

Collaudo del primo pezzo, SPC in produzione e rapporto dimensionale a ogni spedizione.